M/G 01-05 LAGO V

From design to reality: custom engineering, fabrication and installation of a dock for an oil well on Lake Maracaibo.

01 · THE CHALLENGE

Deteriorated dock before the intervention

Infrastructure worn down by time on an active oil well on the Lake.

02 · CUSTOM ENGINEERING

Workshop fabricating custom parts

Design and fabrication of parts tailored to the specific needs of the well.

03 · PRECISE EXECUTION

Dock installation on Lake Maracaibo

Dock installed directly on the Lake, using our own equipment.

04 · OPTIMAL RESULTS

Finished and operational VLM 1071 structure

Structure completed, operational and handed over to the client.

Technical specifications

Structural angles: 3"x3"x1/4"

Decking: G2 grating

Project code: M/G 01-05 LAGO V

Final structure: VLM 1071

"Logistics, fabrication and maintenance: one team, every solution."